International Journal of Engineering
Trends and Technology

Research Article | Open Access | Download PDF
Volume 74 | Issue 2 | Year 2026 | Article Id. IJETT-V74I2P103 | DOI : https://doi.org/10.14445/22315381/IJETT-V74I2P103

Operational Efficiency in Industrial Systems through OEE Analysis


Jorge Epifanio Gamarra Tolentino

Received Revised Accepted Published
30 Sep 2025 31 Dec 2025 11 Jan 2026 14 Feb 2026

Citation :

Jorge Epifanio Gamarra Tolentino, "Operational Efficiency in Industrial Systems through OEE Analysis," International Journal of Engineering Trends and Technology (IJETT), vol. 74, no. 2, pp. 42-53, 2026. Crossref, https://doi.org/10.14445/22315381/IJETT-V74I2P103

Abstract

Overall Equipment Effectiveness (OEE) is a commonly applied metric for assessing productivity in industrial operations. This study analyzes its practical application through a stepwise implementation based on production data obtained from an active manufacturing line. In situations where complete operational records were not available, supplementary data were constructed using realistic assumptions consistent with observed operating conditions. The analysis emphasizes losses associated with equipment availability, operating performance, and product quality, which are frequently underestimated in conventional production monitoring. Recorded operational data were used to characterize these losses and to evaluate their distribution throughout the production process. Based on the observed results, improvement actions related to downtime registration, basic preventive maintenance practices, and rapid changeover techniques, such as SMED, were examined within the evaluated context. The findings indicate that variations in unproductive time have a measurable impact on OEE values, demonstrating that performance improvements can be achieved without immediate investment in additional equipment. The results are representative of manufacturing environments operating under technical and resource-related limitations.

Keywords

OEE, Operational Efficiency, Availability, Performance, Quality, Total Productive Maintenance.

References

[1] Edgard Kovacs, Interpretation of the Application of “OEE” to the Mining Sector, Linkedin, 2016. [Online]. Available: https://es.linkedin.com/pulse/interpretacion-de-la-aplicacion-del-oee-al-sector-kovacs-camauta

[2] Michael Priester, Case Study: Soledad Mining Company on the Efficient use of Energy and Water Resources in Mining and Mineral Processing in the Andean Countries, MINSUS, 2021. [Online]. Available: https://minsus.net/Media-Publicaciones/estudio-de-caso-compania-minera-soledad-del-uso-eficiente-de-los-recursos-energia-y-agua-en-la-mineria/

[3] Six Big Losses in Lean Manufacturing, Vorne Industries, 2025. [Online]. Available: https://www.vorne.com/learn/tools/six-big-losses/

[4] Diomidis H. Stamatis, The OEE Primer: Understanding Overall Equipment Effectiveness, Reliability, and Maintainability, 1st ed., Productivity Press, New York, 2011.
[
Google Scholar] [Publisher Link]

[5] World-Class OEE, Vorne Industries, 2025. [Online]. Available: https://www.oee.com/world-class-oee/

[6] National Scholarship and Educational Loan Program (PRONABEC), “Get on Track” Updates Information to Help Young People Choose a Better Profession To Study, Government of Peru, gob.pe, 2021. [Online]. Available: https://www.gob.pe/institucion/pronabec/noticias/509101-ponte-en-carrera-actualiza-informacion-para-que-jovenes-elijan-mejor-la-profesion-a-estudiar

[7] Bambang Setiawan, Fikri Al Latif, and Erry Rimawan, “Overall Equipment Effectiveness (OEE) Analysis: A Case Study in the PVC Compound Industry,” International Journal of Industrial Engineering and Management, vol. 3, no. 1, pp. 14-25, 2021.
[
CrossRef] [Google Scholar] [Publisher Link]

[8] Sarastya Dewi, Judi Alhilman, and Fransiskus Tatas Dwi Atmaji, “Evaluation of Effectiveness and Cost of Machine Losses using Overall Equipment Effectiveness (OEE) and Overall Equipment Cost Loss (OECL) Methods, a Case Study on Toshiba CNC Machine,” IOP Conference Series: Materials Science and Engineering: 12th International Seminar on Industrial Engineering & Management (ISIEM), Batu, Malang, Indonesia, pp. 1-8, 2020.
[
CrossRef] [Google Scholar] [Publisher Link]

[9] Sedat Toraman, “Evaluation of Overall Equipment Effectiveness (OEE) for Mining Equipment (Shovel-Truck): A Case Study Manisa-Soma (Turkey) Open Pit Mine,” Journal of Scientific Reports-A, no. 056, pp. 45-55, 2024.
[
CrossRef] [Google Scholar] [Publisher Link]

[10] Orlando Enrique Lama Herrera, and Josue Jeremi Alayo Vilcarromero, “Lean Maintenance Implementation Model to Increase the Overall Efficiency of Mining Haulage Equipment through Total Productive Maintenance and Continuous Improvement,” Undergraduate Thesis, Peruvian University of Applied Sciences (UPC), 2020.
[Google Scholar] [Publisher Link]

[11] JIPM Global, Mondelez International, Inc: TPM and OEE Improvement Results, Japan Institute of Plant Maintenance, Tokyo, Japan, 2022. [Online]. Available: https://jipmglobal.com/wp-content/uploads/2023/01/%E8%8B%B1%E8%AA%9E%E2%80%97%E5%8F%97%E8%B3%9E%E4%B8%80%E8%A6%A7.pdf

[12] Juan Ricardo Uzquiano Rodríguez, “Application of Lean Manufacturing to Improve the Productivity of the Soda Cracker Production Line at Mondelez Peru SA, Lima, 2017,” M.E. Thesis, César Vallejo University, 2017.
[Google Scholar] [Publisher Link]

[13] Víctor César Torres Díaz, Implementation of OEE to Increase the Productivity of the Komatsu 730e Truck Fleet at the Volcán Shungar SA Mining Company, Degree Thesis, Private University of the North, 2017.
[Google Scholar] [Publisher Link]