Investigating the Relationship between Risk Factors and Construction Safety Performance in Design-Build Projects of High-Rise Building

Investigating the Relationship between Risk Factors and Construction Safety Performance in Design-Build Projects of High-Rise Building

  IJETT-book-cover           
  
© 2024 by IJETT Journal
Volume-72 Issue-1
Year of Publication : 2024
Author : Gabby Andina Ganesdhi, Danang Budi Nugroho, Yusuf Latief, Mochamad Agung Wibowo, Rosmariani Arifuddin, Fatma Lestari
DOI : 10.14445/22315381/IJETT-V72I1P117

How to Cite?

Gabby Andina Ganesdhi, Danang Budi Nugroho, Yusuf Latief, Mochamad Agung Wibowo, Rosmariani Arifuddin, Fatma Lestari, "Investigating the Relationship between Risk Factors and Construction Safety Performance in Design-Build Projects of High-Rise Building ," International Journal of Engineering Trends and Technology, vol. 72, no. 1, pp. 174-183, 2024. Crossref, https://doi.org/10.14445/22315381/IJETT-V72I1P117

Abstract
High-rise building projects globally experience an alarming accident rate of up to 45% and are primarily influenced by the working environment and behavior. Identifying risk is essential to prevent accidents proactively and needs to be in the project planning phase. Work Breakdown Structure (WBS) is seen as a tool to help identify risk from work packages, and several research have suggested generating risk from each activity to reduce accidents. Presently, no research has been conducted on the relationship between risk and construction safety performance indicators. Therefore, this research aimed to evaluate the risk identification process based on all activities in WBS, including preparation, design, and construction phases, to integrate a whole design and build contract approach not previously explored. It also investigated the relationship and impact of risk during the design and construction phases towards indicators of construction safety performance. Statistical methodology was conducted to analyze the relationship, which resulted in a linear equation model with a strong relationship between risk and safety performance. The result showed that risk-based WBS affects the overall construction safety performance of architectural and exterior works construction on high-rise buildings.

Keywords
Architecture work, Construction safety performance, Risk, Work Breakdown Structure.

References
[1] Zhipeng Zhou, Yang Miang Goh, and Qiming Li, “Overview and Analysis of Safety Management Studies in the Construction Industry,” Safety Science, vol. 72, pp. 337-350, 2015.
[CrossRef] [Google Scholar] [Publisher Link]
[2] Edwin Sawacha, Shamil Naoum, and Daniel Fong, “Factors Affecting Safety Performance on Construction Sites,” International Journal of Project Management, vol. 17, no. 5, pp. 309-315, 1999.
[CrossRef] [Google Scholar] [Publisher Link]
[3] Bilal Manzoor, Idris Othman, and Muneeb Manzoor, “Evaluating the Critical Safety Factors Causing Accidents in High-Rise Building Projects,” Ain Shams Engineering Journal, vol. 12, no. 3, pp. 2485-2492, 2021.
[CrossRef] [Google Scholar] [Publisher Link]
[4] I.D. Purnama, Minister of Manpower Reveals Number of Work Accidents to Increase to 265,334 People in 2022, 2023. Available online: https://economy.okezone.com/read/2023/01/12/320/2744774/menaker-ungkap-jumlah-kecelakaan-kerja-naik-hingga-265-334-orang-di-2022
[5] Stig Winge, and Eirik Albrechtsen, “Accident Types and Barrier Failures in the Construction Industry,” Safety Science, vol. 105, pp. 158- 166, 2018.
[CrossRef] [Google Scholar] [Publisher Link]
[6] Andrew S. Chang, Fang-Ying Shen, and William Ibbs, “Design and Construction Coordination Problems and Planning for Design-Build Project New Users,” Canadian Journal of Civil Engineering, vol. 37, no. 12, pp. 1525-1534, 2010.
[CrossRef] [Google Scholar] [Publisher Link]
[7] Ying Lu et al., “BIM-Integrated Construction Safety Risk Assessment at the Design Stage of Building Projects,” Automation in Construction, vol. 124, 2021.
[CrossRef] [Google Scholar] [Publisher Link]
[8] Patrick Manu et al., “The Health and Safety Impact of Construction Project Features,” Engineering, Construction and Architectural Management, vol. 21, no. 1, pp. 65-93, 2014.
[CrossRef] [Google Scholar] [Publisher Link]
[9] Timothy R. Driscoll et al., “The Role of Design Issues in Work-Related Fatal Injury in Australia,” Journal of Safety Research, vol. 39, no. 2, pp. 209-214, 2008.
[CrossRef] [Google Scholar] [Publisher Link]
[10] Amirah Syifa, “Analysis of Resource Requirements for Construction Safety (K2) Architectural Work for High-Rise Buildings for Rusunawa/Rusunami Based on PUPR Ministerial Decree No. 10 of 2021 to Estimate K2 Costs,” Fakultas Teknik Universitas Indonesia, 2022.
[Publisher Link]
[11] Kai Chen Goh et al., “Accidents Preventive Practice for High-Rise Construction,” MATEC Web of Conferences, vol. 47, pp. 1-6, 2016.
[CrossRef] [Google Scholar] [Publisher Link]
[12] P. Guide, A Guide to the Project Management Body of Knowledge, Project Management Institute, pp. 1-176, 2018.
[Google Scholar] [Publisher Link]
[13] J.C. Van Tonder, and M.C. Bekker, “Analysis of a Methodology to Obtain a Work Breakdown Structure Built Up From Interdependent Key Project Deliverable Packages,” African Rhythm Project Management Conference, Johannesburg South Africa, pp. 1-13, 2002.
[Google Scholar] [Publisher Link]
[14] Lei Su, “WBS-Based Risk Identification for the Whole Process of Real Estate Project and Countermeasures,” 2012 National Conference on Information Technology and Computer Science, pp. 72-75, 2012.
[CrossRef] [Google Scholar] [Publisher Link]
[15] A. Putro et al., “Development of Work Breakdown Structure for Stadium Work as Project Guideline and Standard,” International Journal of Engineering, vol. 35, no. 7, pp. 1291-1299, 2022.
[CrossRef] [Google Scholar] [Publisher Link]
[16] Jimmie Hinze, Matthew Hallowell, and Kevin Baud, “Construction-Safety Best Practices and Relationships to Safety Performance,” Journal of Construction Engineering and Management, vol. 139, no. 10, 2013.
[CrossRef] [Google Scholar] [Publisher Link]
[17] John A. Gambatese, Michael Behm, and Sathyanarayanan Rajendran, “Design’s Role in Construction Accident Causality and Prevention: Perspectives from an Expert Panel,” Safety Science, vol. 46, no. 4, pp. 675-691, 2008.
[CrossRef] [Google Scholar] [Publisher Link]
[18] Danang Budi Nugroho, and Yusuf Latief, “A Conceptual Framework for Knowledge Management of Integrated Design and Construction Phase Audit Process on Infrastructure Project Based on Risk, Using WBS, BIM and Web to Enhance Construction Safety Performance,” Proceedings of the 7th North American International Conference on Industrial Engineering and Operations Management, Orlando, Florida, USA, pp. 1-13, 2022.
[Google Scholar] [Publisher Link]
[19] Qing-Fu Li, Peng Zhang, and Yan-Chao Fu, “Risk Identification for the Construction Phases of the Large Bridge Based on WBS-RBS,” Research Journal of Applied Sciences, Engineering and Technology, vol. 6, no. 9, pp. 1523-1530, 2013.
[CrossRef] [Google Scholar] [Publisher Link]
[20] Simone Ponticelli, William J. O’Brien, and Fernanda Leite, “Advanced Work Packaging as Emerging Planning Approach to Improve Project Performance: Case Studies from the Industrial Construction Sector,” International Construction Specialty Conference of the Canadian Society for Civil Engineering, Vancouver, British Columbia, pp. 1-10, 2015.
[CrossRef] [Google Scholar] [Publisher Link]
[21] Ferdinand Fassa, Andreas Wibowo, and Anton Sokiman, “Causes and Impact of Accidents, as well as Safety Solutions in Construction Projects for the 2016-2020, Period: Literature Review,” Jurnal Teknik Sipil dan Teknologi Konstruksi, vol. 7, no. 1, pp. 111-123, 2021.
[Google Scholar] [Publisher Link]
[22] Yusuf Zalaya, Putri Handayani, and Ike Widya Lestari, “Management of Construction Waste in Building Construction Projects,” Forum Ilmiah, vol. 16, no. 1, pp. 1-10, 2019.
[Google Scholar] [Publisher Link]
[23] Ida Ayu Rai Widhiawati, Yudha Astana, and Ni Luh Ayu Indrayani, “Study of Construction Waste Management in Building Construction Projects in Bali,” Jurnal Ilmiah Teknik Sipil, vol. 23, no. 1, pp. 55-61, 2019.
[CrossRef] [Google Scholar] [Publisher Link]
[24] Mei Brilian Harefa, Implementation Of Construction Waste Processing Management In Realizing Green Construction (Case Study: Construction of Transmart Carrefour Padang), Juitech: Jurnal Ilmiah Fakultas Teknik Universitas Quality, vol. 4, no. 1, pp. 20-30, 2020.
[Google Scholar] [Publisher Link]