Application of BIM Methodology in Public and Private Electricity and Telecommunications Projects in Peru

Application of BIM Methodology in Public and Private Electricity and Telecommunications Projects in Peru

  IJETT-book-cover           
  
© 2023 by IJETT Journal
Volume-71 Issue-7
Year of Publication : 2023
Author : Angel Traverso-Frisancho, Victor Romero-Alva
DOI : 10.14445/22315381/IJETT-V71I7P207

How to Cite?

Angel Traverso-Frisancho, Victor Romero-Alva, "Application of BIM Methodology in Public and Private Electricity and Telecommunications Projects in Peru," International Journal of Engineering Trends and Technology, vol. 71, no. 7, pp. 67-74, 2023. Crossref, https://doi.org/10.14445/22315381/IJETT-V71I7P207

Abstract
Peru currently faces inefficient performance, cost overruns, delays and stoppages in the construction of public investment projects; of the 2346 paralyzed building projects, 1042 appear as the application result of the traditional methodology for the planning and execution of projects. In the present work, an alternative to solve this problem is the application of the BIM methodology in electrical and communications installations associated with public and private investment projects through Revit 2023 software. As a result of the present study, it was possible to streamline the documentation, obtaining a multidisciplinary environment of three-dimensional modeling of both electrical and telecommunications installations with parametric and precise accuracy hand in hand with technological advances such as 3D printing, augmented reality, and industry 5.0, among others and leading a correct administration and supervision of all parties involved in the building throughout the life cycle of the project. These results demonstrate the multiple benefits of the BIM methodology applied in public or private projects related to electrical and telecommunications installations, serving as a basis for future actions.

Keywords
BIM methodology, Electrical plans, Public investment projects, Revit software, 3D modeling.

References
[1] [Online]. Available: https://cdn.www.gob.pe/uploads/document/file/3720744/Reporte%20obras%20paralizadas.pdf.pdf
[2] I. F. Taquire Zambrano, “Execution of Technical Files with Deficiencies in the Construction of Public Infrastructure Works,” Peru Mg. Thesis, Graduate School, Cesar Vallejo University, Lima, 2019.
[Google Scholar] [Publisher Link]
[3] Supreme Decree No. 289-2019-EF- Gobierno del Perú, [Online]. Available: https://www.gob.pe/institucion/mef/normas-legales/293869-289-2019-ef
[4] Reporte de obras paralizadas 2019 - Gerencia de Control de Servicios Públicos Básicos, La Contraloría General de la República del Perú. [Online]. Available: https://doc.contraloria.gob.pe/estudios-especiales/documento_trabajo/2019/Reporte_Obras_Paralizadas.pdf. 2019.
[5] Health in Abandonment: 2021 Ends with 16 Hospital Works Paralyzed [Report] RPP Noticias. [Online]. Available: https://rpp.pe/peru/actualidad/la-salud-en-abandono-el-2021-termina-con-16-obras-de-hospitales-paralizadas-informe-noticia-1374258?ref=rpp
[6] Retos para dinamizar la inversión pública, Banco Central de Reserva del Perú. [Online]. Available: https://www.bcrp.gob.pe/docs/Publicaciones/Reporte-Inflacion/2019/marzo/ri-marzo-2019-recuadro-4.pdf
[7] Apaza Mango et al, Failure to Comply with the Deadline and Cost due to the Deficient Preparation of Technical Files, by Not Using Bim Methodology Tools, In the Public Sector of the Arequipa Region. Case Study: Construction of the Professional Schools of Computer Science and Telecommunications Engineering, District, Province and Region of Arequipa, Peruvian University of Applied Sciences, 2021. [Online]. Available: https://renati.sunedu.gob.pe/handle/sunedu/3097775
[8] Walter Andía Valencia, La demanda insatisfecha en los proyectos de inversión pública, Producción y Gestión. vol. 14, no. 2, pp. 67-72, 2011.
[Google Scholar] [Publisher Link]
[9] Husnul Khatimi, and Muhammad Rodlin Afif, "Implementation Building Information Modeling (BIM) 5D In Development Project of The Dakwah Building Campus 2 UIN Antasari Banjarbaru," SSRG International Journal of Civil Engineering, vol. 8, no. 12, pp. 29-34, 2021.
[CrossRef] [Google Scholar] [Publisher Link]
[10] Felipe Portocarrero M, “The Peruvian Public Investment Programme 1968–78,” Journal of Latin American Studies, vol. 14, no. 2, pp. 433-454, 1982.
[CrossRef] [Google Scholar] [Publisher Link]
[11] F. H. Mallqui Salazar, Propuesta de un método para formular presupuestos de reactivación en obras paralizadas de infraestructura sanitaria Junín. [Online]. Available: https://repositorio.uncp.edu.pe/handle/20.500.12894/8721
[12] A. Villamizar, Adoption of BIM in the world, 2021. [Online]. Available: https://idesie.com/blog/2021/04/15/adopcion-del-bim-en-el-mundo/
[13] A way forward for Spain, McKinsey & Company, 2021. [Online]. Available: https://www.mckinsey.com/~/media/mckinsey/featured%20insights/Europe/Women%20matter%202017%20A%20way%20forward%20for%20Spain/Women-matter-2017-A-way-forward-for-Spain.ashx
[14] Plan de implementación y hoja de ruta del plan bim perú, m.e.f 2021. [Online]. Available: https://www.mef.gob.pe/contenidos/inv_publica/anexos/anexo_RD0002_2021EF6301.pdf
[15] Arpit A. Bhusar, Ashish R. Akhare, "Application of BIM in Structural Engineering," SSRG International Journal of Civil Engineering, vol. 1, no. 5, pp. 1-5, 2014.
[CrossRef] [Google Scholar] [Publisher Link]
[16] Díaz Valdivia, and José Carlos, Implementation of Bim-Vdc Technology for the Management of the Design and Construction of Electrical Mechanical Installations, case of Retail Restaurantes Ekeko, Arequipa, 2017-2018.
[Google Scholar] [Publisher Link]
[17] O. A. Peña, New Perspectives Offered by Bim Technology for the Development of Telecommunications Infrastructure Projects, 2019. [Online]. Available: https://blog.bimserver.center/es/nuevas-perspectivas-que-ofrece-la-tecnologia-bim-para-el-desarrollo-de-proyectos-de-infraestructuras-de-telecomunicaciones/
[18] Khalid S. A. Al-Gahtani, "Review Current Value Engineering Studies Towards Improve Automation within Building Information Management (BIM)," SSRG International Journal of Civil Engineering, vol. 9, no. 2, pp. 1-9, 2022.
[CrossRef] [Google Scholar] [Publisher Link]
[19] The Paralyzed Hospitals Must be Audited to Find out if the Advanced is Useful or if we Have to Start From Scratch, 2022. [Online]. Available: https://www.cutivalu.pe/se-debe-hacer-auditoria-a-los-hospitales-paralizados-para-saber-si-lo-avanzado-sirve-o-hay-que-empezar-de-cero/
[20] Zhen-Zhong Hu et al., “BIM-Based Integrated Delivery Technologies for Intelligent MEP Management in the Operation and Maintenance Phase,” Advances in Engineering Software, vol. 115, pp. 1-16, 2018.
[CrossRef] [Google Scholar] [Publisher Link]
[21] Soumyajit Koley, "Exploring Social Value Prospects of Australia’s Construction Industry Towards the Aboriginal Communities, Under COVID-19 Recovery Efforts," International Journal of Engineering Trends and Technology, vol. 70, no. 12, pp. 227-251, 2022.
[CrossRef] [Google Scholar] [Publisher Link]
[22] Noa Mayta, Alberth, Vergara Ovalle, Omar, Design of special electrical installations applying Bim technology, automation and hybrid self-generation, of a 5-star hotel, Bachelor's thesis, National University of San Antonio Abad of Cusco, 2021. [Online]. Available: http://hdl.handle.net/20.500.12918/6414
[23] Stephanie L. McNulty, and Gustavo Guerra Garcia, “Politics and Promises: Exploring Fifteen Years of Peru’s Participatory Decentralization Reform,” Public Organization Review, vol. 19, no. 1, pp. 45-64, 2019.
[CrossRef] [Google Scholar] [Publisher Link]
[24] María Luisa Candia Maquera et al., “Improvement of the Planning of Hospital Infrastructure Projects Applying BIM to Optimize Constructability,” Master's thesis, Technological University of Peru, 2018.
[Google Scholar] [Publisher Link]
[25] Reactivación de obras públicas paralizadas, Banco central de reserva del Perú (B.C.R.), 2019. [Online]. Available: https://www.bcrp.gob.pe/docs/Publicaciones/Reporte-Inflacion/2019/diciembre/ri-diciembre-2019-recuadro-1.pdf
[26] E. Turpo, Aplicación de la metodología BIM para mejorar el desempeño de los procesos constructivos en la estación subterránea de la línea 2 del metro de Lima – 2020, Tesis de licenciatura, Universidad Privada del Norte, 2020. [Online]. Available: https://hdl.handle.net/11537/25178