The Demand Driven MRP Implementation in Complex Manufacturing Industries: A Systematic Literature Reviews

The Demand Driven MRP Implementation in Complex Manufacturing Industries: A Systematic Literature Reviews

  IJETT-book-cover           
  
© 2023 by IJETT Journal
Volume-71 Issue-3
Year of Publication : 2023
Author : Daniel Benavente, Stephano Peralta, Grimaldo Quispe, Javier Moguerza, Carlos Raymundo
DOI : 10.14445/22315381/IJETT-V71I3P205

How to Cite?

Daniel Benavente, Stephano Peralta, Grimaldo Quispe, Javier Moguerza, Carlos Raymundo, "The Demand Driven MRP Implementation in Complex Manufacturing Industries: A Systematic Literature Reviews," International Journal of Engineering Trends and Technology, vol. 71, no. 3, pp. 33-45, 2023. Crossref, https://doi.org/10.14445/22315381/IJETT-V71I3P205

Abstract
Since its creation in 2011, the DDMRP planning method has been catalogued as an important tool to deal with the high variability of the environment, especially in demand, since it allows modifying inventory levels without neglecting the level of service and quality of the products. However, the volume of research available on this method is small, even more, so those considering the application in complex industries. The objective of this research was to analyze the available literature about the application of the model in complex industries, considering its application trends, buffer positioning and improvement target factors. In addition, it allowed identifying areas that other researchers should study in the future. This systematic review scrutinized different applications of the method in complex industries worldwide by analysing literature in different languages. This research identified that certain characteristics of the DDMRP require further study, especially real and simulated applications. On the one hand, more research is required in applying the last two phases of the method (planning based on demand and visible and collaborative execution), as well as the need to deepen in economic terms and the possibility of combining it with other similar or complementary methods. Thanks to this literature review, it was possible to recognize the impact of the implementation of the DDMRP in complex industries, identify the factors that influence its effectiveness and describe the need to delve into various issues that have not yet been analyzed in depth, seeking to understand the best way the studied method.

Keywords
Complex industry, Decoupled lead time, Demand-driven, Demand-Driven Material Requirements Planning (DDMRP), Systematic literature review.

References
[1] Cássia Taisy Alencar de Andrade, Ana Paula Henriques de Gusmão, and Wladson Silva, “World Class Manufacturing Performance Measurement Using a Maturity Model and the Flowsort Method,” International Journal of Production Research, vol. 59, no. 24, pp. 7374–7389, 2021. Google Scholar | CrossRef | Publisher Link
[2] Ptak, C., and Smith, C, Demand Driven Material Require-Ments Planning (DDMRP), Industrial Press, Incorporated, 2016.
[3] Ahlam Azzamouri et al, “Demand Driven Material Requirements Planning (DDMRP): A Systematic Review and Classification,” Journal of Industrial Engineering and Management, vol. 14, no. 3, p. 439, 2021.
Google Scholar | CrossRef | Publisher Link
[4] Angela Patricia Velasco Acosta, Christian Mascle, and Pierre Baptiste “Applicability of Demand-Driven MRP in a Complex Manufacturing Environment,” International Journal of Production Research, vol. 58, no. 14, pp. 4233–4245, 2020. Google Scholar | CrossRef | Publisher Link
[5] Alaitz Kortabarria et al., “Material Management Without Forecasting: From MRP to Demand Driven MRP,” Journal of Industrial Engineering and Management, vol. 11, no. 4, p. 632, 2018. Google Scholar | CrossRef | Publisher Link
[6] Hasbullah Hasbullah, and Yadi Santoso, “Overstock Improvement By Combining Forecasting, EOQ, and ROP,” Journal PASTI, vol. 14, no. 3, p. 230, 202. Google Scholar | CrossRef | Publisher Link
[7] Daeli Franco-Quispe et al., “Production Planning and Control Model to Increase on-Time Deliveries Through Demand-Driven MRP and PDCA in A Make-to-Order Environment of Non-Primary Manufacturing Industry,” Human Interaction, Emerging Technologies and Future Systems V, vol. 319, pp. 1209–1217, 2022. Google Scholar | CrossRef | Publisher Link
[8] Lucy Casallo et al., “Application of Mixed Methodologies in the Production Planning of Screw Conveyors for the Flour and Pasta Food Industry,” International Journal of Engineering Trends and Technology, vol. 70, no. 8, pp. 435-446, 2022. CrossRef | Publisher Link
[9] J. D. Velásquez, “A Short Guide to Writing Systematic Literature Reviews Part 3,” DYNA, vol. 82, no. 189, pp. 9–12, 2015. Google Scholar | CrossRef | Publisher Link
[10] Stephanie Bayard, Frederic Grimaud, and Xavier Delorme, “Study of Buffer Placement Impacts on Demand Driven MRP Performance,” IFAC-Papersonline, vol. 54, no. 1, pp. 1005–1010, 2021. Google Scholar | CrossRef | Publisher Link
[11] Frances Buccomino, “Manufacturing Planning and Control System: The Ddmrp Applied to a Business Case,” Politecnico Di Torino, 2021. Publisher Link
[12] Tavares, and Ana Carina Mira, “Demand Driven Material Requirements Planning (DDMRP): Exploratory Study,” Universidade Nova De Lisboa, 2019. Publisher Link
[13] Hulas Raj Tonday et al., "Study of Implementation of Agile Supply Chain for Efficient Delivery of Essentials During Covid-19," SSRG International Journal of Mechanical Engineering, vol. 8, no. 8, pp. 1-5, 2021. Google Scholar | CrossRef | Publisher Link
[14] Pedro Miguel Pimenta Almeida, “Leveling Stocks of Raw Materials and Components in an Automotive Industry,” General Study UC Scientific Repository, 2020. Publisher Link
[15] Builes, J. “Framework for DDMRP Implementation At Non-Stick GSA Plant,” Universidad EAFIT. Repository, 2019.
[16] Fabio Provenzano, “Modelli Innovativi Di Gestione Delle Scorte Nella Filiera Logistica: Applicazione Del Metodo DDMRP Nel Setto-Re Automotive,” Politécnico Di Torino, 2019. Publisher Link
[17] Borda, L. “Demand Driven Methodology for Service Improvement and Cost Reduction,” Universidad EAFIT, Medellin, Colombia, Repository, 2016.
[18] Joana Costa Portela, “Development of a DDMRP Methodology Simulation Model,” Scientific Repository of the Polytechnic Institute of Porto, 2021. Publisher Link
[19] Blanco, A, “Analysis of the Demand Driven Material Requirements Planning (Ddmrp) Methodology and Its Implementation in the Pharmaceutical Plant of Servier S.L,” Universi-Dad Pontificia Comillas, 2021.
[20] Pradeep Verma, "Effective Execution of Mergers and Acquisitions for IT Supply Chain," International Journal of Computer Trends and Technology, vol. 70, no. 7, pp. 8-10, 2022. CrossRef | Publisher Link
[21] Romain Miclo et al., “Demand Driven MRP: Assessment of a New Approach to Materials Management,” International Journal of Production Research, vol. 57, no. 1, pp. 166–181, 2019. Google Scholar | CrossRef | Publisher Link
[22] Solorzano, I. “Design of a Demand Driven Management Model for the Corporate Purchasing Process of A Business Group in the Food Sector Based on the Collaborative Planning Methodology,” Escuela Supe-Rior Politécnica Del Litoral, 2019.
[23] Matthias Thürer et al., “Production Planning and Control in Multi-Stage Assembly Systems: An Assessment of Kanban, MRP, OPT (DBR) and DDMRP by Simulation,” International Journal of Production Research, vol. 60, no. 3, pp. 1036–1050, 2022. Google Scholar | CrossRef | Publisher Link
[24] Cajamarca, F, “Design and Implementation Proposal of a Demand Driven Management - MRP Model for the Supply and Inventory Management Processes of a Company That Processes and Markets Animal Nutrition Products. (Tesis De Maestría),” Escuela Superior Politécnica Del Litoral.
[25] Pérez, M., “Design of a Demand Dri-Ven Management Model - MRP, for the Raw Material Purchasing Process of a Food Supply Company,” Escuela Superior Politécnica Del Litoral, 2018.
[26] Dhruva Joshi, and Dr. Nagendra Sohani, "Study of 3rd Party Logistics in Automotive Manufacturer Company," SSRG International Journal of Industrial Engineering, vol. 2, no. 2, pp. 19-21, 2015. CrossRef | Publisher Link
[27] Hietikko, J, “Supply Chain Integration With Demand Driven Material Requirements Planning System - Case: Wärtsilä 4-Stroke,” University of Vaasa, 2014.
[28] Navarrete, J. “Design of a Demand Driven Management Model - Mrp, for the Supply of Air Oils and Lubricants for A Supersonic Aircraft Fleet,” Escuela Superior Politécnica Del Litoral, 2019.
[29] Mohamad Jihan Shofa, and Wahyu Oktri Widyarto, “Effective Production Control in an Automotive Industry: MRP Vs. Demand-Driven MRP,” AIP Conference Proceedings, vol. 1855, no. 1, p. 020004, 2017. Google Scholar | CrossRef | Publisher Link
[30] Miriam Pekarcıkova et al., “Demand Driven Material Requirements Planning. Some Methodical and Practical Comments,” Management and Production Engineering Review, vol. 10, no. 2, 2019. Google Scholar | CrossRef | Publisher Link
[31] Zachariah, A. Demand Driven Materials Requirement Planning (DDMRP). A New Method for Production and Planning Management,” Politecnico Di Milano, 2018.
[32] Juan Gallegos Mardones, “Working Capital Management and Business Performance: Evidence From Latin American Companies,” Economic Research-Ekonomska Istraživanja, vol. 35, no. 1, pp. 3189–3205, 2022. Google Scholar | CrossRef | Publisher Link
[33] Haftu Hailu, and Tewedros Hailu, "Reduction of Long Delivery Time By Implementing Advanced Kaizen (Problem Solving Approach)," SSRG International Journal of Industrial Engineering, vol. 4, no. 3, pp. 26-48, 2017. CrossRef | Publisher Link
[34] Léo Ducrot, and Ehtesham Ahmed, “Investigation of Potential Added Value of DDMRP in Planning Under Uncertainty at Finite Capacit,” Massachusetts Institute of Technology, 2019. Publisher Link